Follow the YUKA mini SOP from top-cover and mid-frame access through drive-board replacement, cable reconnection and reassembly.
Power off, remove the security key and wear protective gloves before starting.
Before you start
Preparation
For YUKA mini hardware matching the supplied January 2025 SOP. Check the actual component and connector arrangement before fitting a replacement.
Keep the mower off with its security key removed throughout mechanical work. Protect disconnected power contacts and record cable positions.
Keep fasteners from each cover, bracket and board separate, and preserve the original seals and cable routes.
Tools & supplies
T20 driver
Confirmed Kafuter glue and application instructions
Separate hardware trays, protective gloves and a camera for cable records
Source & repair notes
References use physical PDF pages, starting with the first PDF page as page 1.
This is the YUKA mini covered by the January 2025 SOP. It does not establish a procedure for YUKA mini Vision or YUKA mini 2.
The tool-list entry “Electric Screwdriver (5Nm)” identifies the listed tool. It is not a per-fastener tightening specification; do not apply 5 N·m to every screw.
Editorial preparation, replacement matching and final checks are identified separately from source operations. Undocumented connector pinouts, compatibility, torque and commissioning must be confirmed for the actual hardware.
Step 1 of 150 of 15 checked
PreparationStep 1 of 15
Power off and prepare the mower
Move the mower off its charging station, switch it off and remove the security key. Wait for moving parts to stop before handling the mower.
Use a clean, dry work area. Protect the shell and vision module if the mower needs support, and wear protective gloves around the cutting blades.